HOW ARE YOU HANDLING

RAPID VOLTAGE CHANGE
INTERCONNECTION REQUIREMENTS?

INTRODUCING THE

RVC Solution


The RVC solution is a proven to pass the utility audit for rapid voltage change interconnection requirements. This self-contained product arrives ready for easy installation and pre-configured operation.

myPV RVC Solution for rapid voltage change requirements.
The RVC Solution literally drops in place and is ready to run, freeing your EPC to focus on achieving commercial operation.

Brad Micallef
Managing Director | Solar Operations Solutions, LLC.

DESIGNED TO PASS YOUR AUDIT
  • Known and recognized by the utility audit teams
  • Fully operational before energization
  • No local network or operational SCADA required
AFFORDABLE & AVAILABLE
  • Lowest full solution and installation cost
  • No hidden soft costs, no programming required
  • Lead time is typically 10-12 weeks from PO
DESIGNED FOR RELIABILITY
  • UL labeled MV and controls solution
  • NEMA 3R powder-coated utility enclosure
COMPLETE PROJECT LIFECYCLE
  • Simple to include in advanced study response
  • Works for pre-energization audit and anti-island testing
  • Supports LOTO for maintenance events
EASY INSTALLATION
  • Pad-mounted with small mechanical footprint
  • In-line MV electrical installation
  • Self-contained, no auxillary power required
FULLY-SUPPORTED
  • Standard 1 year warranty
  • Warranty extension available

FEATURES

myPV RVC Solution for rapid voltage change requirements, indicator lights.

The RVC Solution is specifically engineered to help Developers and EPCs achieve commercial operation on time and within budget!

COMPARE YOUR OPTIONS

Comparison between myPV RVC Solution and alternatives for rapid voltage change requirements.

RVC Solution Specifications


Interior of the RVC Solution
BROAD COMPATIBILITY:
  • 15 kV and 25 kV MV models available
  • 200 A bushings standard, 600 A available
  • WYE and DELTA ISU wiring compatible
  • Inverter make/model and LV agnotistic
AUTONOMOUS OPERATION:
  • Switching cycle operates automatically on grid restoration or loss
  • Intuitive user HMI LCD and indicator lights clearly communicate switching and operational status
  • Built-in TEST MODE supports de-energized switching cycle testing
MINIMAL TERMINATIONS:
  • 3-Phase MV from POI
  • 3-Phase MV to first ISU Primary H1
  • 3-Phase LV to first ISU Secondary X1
  • Ground ring bonding

Have questions? Call (470) 387-9011

RVC Solution

Rapid Voltage Change Solution

PROVEN

AFFORDABLE

RELIABLE


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

myPV - Turnkey Solutions for PV Solar.
(470) 387-9011 • Follow us on LinkedIn